PROBLEM: A national pharmaceutical manufacturer with a strong
presence in the Mid-West needed multiple major projects done
through the Christmas shutdown period. One consisted of correcting
moisture mitigation problems in production rooms while the
other plant location involved strategic corridors that feed
production and could not be shut down any other time.
SOLUTION: Desco pulled from the combined strength
of our three production centers and amassed the “man-power” and
talent to expertly plan, order and address each plants concerns.
In one, the floors were completely removed down to a very uneven
structural slab while protecting equipment supports. In concert
with a leading moisture mitigation company, Desco applied and
reapplied the Desco Quartz Cremona floors while leaving enough
time at the end for proper cure of a decorative, chemical resistant
quartz system. The other plant provided the drama of not knowing
until the last minute that an upstairs corridor would need
to be added to the already substantial work load. The Desco
project manager and foreman logistically worked out the amorphic
schedule to make sure all the hand troweled Desco Quartz Cremona
floor and integral cove base were completed on their schedule.